Commit graph

6 commits

Author SHA1 Message Date
Azgaar
a285d450c8 feat: refactor draw-relief-icons renderer to utilize WebGL2LayerFramework
- Removed global renderer, camera, and scene management in favor of layer framework integration.
- Implemented terrain layer registration with setup, render, and dispose methods.
- Enhanced texture loading and caching mechanisms.
- Updated geometry building to return Mesh objects directly.
- Added performance benchmarking story for render performance validation.
- Created bundle size audit story to ensure effective tree-shaking and size constraints.
2026-03-12 15:04:37 +01:00
Azgaar
30f74373b8 feat: Refactor draw-relief-icons.ts to integrate with WebGL2LayerFramework
- Implemented registration of draw-relief-icons with WebGL2LayerFramework, removing module-level renderer state.
- Updated drawRelief, undrawRelief, and rerenderReliefIcons functions to utilize framework methods.
- Ensured SVG fallback path is preserved and functional.
- Added performance criteria for rendering relief icons.
- Created tests to verify fallback integration and visual parity with existing SVG output.

test: Add WebGL2 fallback integration verification

- Introduced new tests for WebGL2LayerFramework to ensure no-ops when fallback is active.
- Verified that drawRelief routes to SVG when WebGL2 is unavailable.
- Confirmed visual parity between SVG output and existing implementation.
- Ensured all tests pass with updated coverage metrics.
2026-03-12 14:28:33 +01:00
Azgaar
8c78fe2ec1 Refactor code structure for improved readability and maintainability 2026-03-12 14:14:29 +01:00
Azgaar
769ef9eff0 feat: implement WebGL2 layer framework with core functionalities including init, resize observation, and D3 zoom subscription 2026-03-12 13:44:23 +01:00
Azgaar
42b92d93b4 feat: update sprint status to reflect in-progress development for WebGL Layer Framework module 2026-03-12 05:15:54 +01:00
Azgaar
6b7029a05b Add sprint status and implementation readiness documents for Fantasy-Map-Generator
- Created sprint-status.yaml to track development status of epics and stories.
- Added epics.md detailing the breakdown of functional and non-functional requirements for the project.
- Introduced implementation-readiness-report-2026-03-12.md summarizing document inventory, PRD analysis, epic coverage validation, UX alignment assessment, and overall readiness status.
2026-03-12 05:09:46 +01:00